Month: October 2024
LECA Bid No. 3 – Revised Transaction Documents
The LECA Bid Bulletin No. 3 provides important insights into the energy sector’s bidding process, highlighting the steps for a transparent and fair Competitive Selection Process (CSP). This ensures power suppliers offer the best possible rates and terms to electric cooperatives (ECs).
LECA Bid No. 2 Revised Transaction Documents & Transaction Schedule
On October 14, 2024, the National Electrification Administration-Special Bids Awards Committee (NEA-SBAC) issued Bid Bulletin No. 2, updating the schedule for the Joint Competitive Selection Process for the Aggregated Baseload Supply of Luzon On-Grid Electric Cooperatives (LECA). This announcement follows the original Invitation to Bid and sets key dates for the revised process.The NEA-SBAC emphasized […]
Steel Pole Requirements for 2025
Key Highlights of the 2025 Steel Pole Requirements for Region 5 Outlines crucial standards for steel pole infrastructure in Region 5. These poles, essential for power transmission, are designed for durability, strength, and sustainability. Key points include: As 2025 approaches, it’s vital for contractors to align with these guidelines to meet industry standards and enhance […]